Siripong Inspects Thai-Chinese High-Speed Rail Contracts 4-7
Thansettakij•Economy•
Full article content is available on the original source.
Source: Thansettakij (Original)
Key Entities
Person
Siripong Angkasakulkiat(สิริพงศ์ อังคสกุลเกียรติ)
Deputy Minister of Transport who inspected the Thai-Chinese High-Speed Rail Project.
Organization
Policy
Thai-Chinese High-Speed Rail Project(โครงการรถไฟความเร็วสูงไทย – จีน)
A high-speed railway development project between Thailand and China.
Place
A province where the high-speed rail project and Saraburi Station are located.
A location within the scope of Contracts 4-7 for the high-speed rail project.
Takut Subdistrict(ตำบลตะกุด)
The location of the Saraburi High-Speed Rail Station.
The district where the Saraburi High-Speed Rail Station is situated.
A location of tunnel construction in Contract 3-2.
A location of tunnel construction in Contract 3-2.
Hin Lap Tunnel(อุโมงค์หินลับ)
A tunnel being constructed as part of the high-speed rail project.
Khlong Phai Tunnel(อุโมงค์คลองไผ่)
A tunnel being constructed as part of the high-speed rail project.
Muak Lek Tunnel(อุโมงค์มวกเหล็ก)
A tunnel being constructed as part of the high-speed rail project.
Pha Sadet Tunnel(อุโมงค์ผาเสด็จ)
A tunnel being constructed as part of the high-speed rail project.