MP Urges BMA to Vet Drainage Tunnel Contractor
Khaosod•Politics•
Full article content is available on the original source.
Source: Khaosod (Original)
View Original Article
Key Entities
Person
Nattaphong Prempoolsawat(ณัฐพงศ์ เปรมพูลสวัสดิ์)
An MP for Bangkok from the People's Party.
The Governor of the Bangkok Metropolitan Administration.
Organization
People's Party(พรรคประชาชน)
The political party of MP Nattaphong Prempoolsawat.
The local government body overseeing the drainage tunnel projects in Bangkok.
BMA Department of Drainage and Sewerage(สำนักการระบายน้ำ กทม.)
The agency managing the drainage tunnel projects.
The government agency requested to clarify contractor qualification levels.
Place
Bueng Nong Bon(บึงหนองบอน)
The site of the drainage tunnel project capable of storing 5 million cubic meters of water.
A canal with slow drainage efficiency and the starting point of the tunnel extension.
Khlong Si(คลองสี่)
The endpoint of the Bueng Nong Bon drainage tunnel extension.
Khlong Prem Prachakorn(คลองเปรมประชากร)
The site of a delayed drainage tunnel project managed by the same contractor.
The site of a delayed drainage tunnel project managed by the same contractor.
Khlong Nong Bon(คลองหนองบอน)
A small canal that limits water transport to Bueng Nong Bon.
Khlong Makham Thet(คลองมะขามเทศ)
A small canal that limits water transport to Bueng Nong Bon.
Policy
BMA Invitation Announcement Clause 6.5(ประกาศเชิญชวนฯ ของ กทม. ข้อ 6.5)
A regulation allowing the BMA to call bidders for financial clarification and potentially reject unsuitable proposals.